Old Siding on South Side of Building Being Removed
-
B
Excavation Starts On Site
-
N
-
M
-
C
-
A
Excavation Complete
-
T
Lumber and Posts Arrive
-
F
Post Holes Dug
-
G
Posts Installed
-
D
80 Foot Trusses Arrive On Site
-
E
-
H
Crane Lifting First Truss For Placement
-
I
First Truss Installed In Place
-
Q
-
J
-
R
-
S
-
L
Windows And Doors Arrive
-
P
Installing Plywood
-
O
Iceguard Installed Over Plywood
-
W
Shingles Delivered
-
Trenches dug for underground plumbing and electrical
-
Underground plumbing installed in trenches
-
Foam insulation, plastic vapor barrier, wire mesh and rebar installed to prep floor for concrete.
-
Concrete trucks ready for the pour.
-
Concrete pouring into the pumper.
-
Concrete flowing out of pumper while other areas are floated.
-
Working on finishing the poured floor.
-
Electrical Work Being Completed.
-
-
Insulation and Rough Electrical Completed.
-
Drywall Being Delivered.
-
Drywall Being Installed.
-
Ceiling Drywall Installation Completed
-
Gas lines and 55 ft. Tube Heater Installed In New Warehouse.
-
Final Excavation Starting Around New Addition
-
North Side Of Building Ready For Grass Seed
-
Ready For Grass Seed
-
Grass Seed Planted
-
Garage Doors Getting Installed
-
Garage Doors Getting Installed
-
-
-
Taping the Seams on the Ceiling
-
Taping Ceiling Joints
-
-
Ceiling Textured and Ready For Painting
-
Wall Liner Installed on Interior Walls
-
North Inside Wall Installation Completed
-
Interior Wall Painted to Match New Construction
-
Applying Hardener Finisher to Concrete Floor
-
Applying Hardener Finisher to Concrete Floor
-
Applying Hardener Finisher to Concrete Floor
-
Applying Hardener to Concrete Floor
-
Sealer Coat Applied to Floor After Hardener Dried for 24 Hours
-
Electrical Service Upgraded for Increased Capacity & Additional Requirements
-
-
-
-
-
Insulation Installed of Ceiling of New Addition
-
Insulation Installed of Ceiling of New Addition
-
Insulation Installed of Ceiling of New Addition
-
Install new energy efficient windows into office, showroom, conference room, embroidery area, and lunch room
-
Install new energy efficient windows into office, showroom, conference room, embroidery area, and lunch room
-
K
Windows And Doors Installed
-
Doors installed, downspouts, facia and gutters completed, bollards ready for concrete.
-
Grading and Top Soil Spread Around Exit Doors On East Side Of Building
-
Final Truckload of Top Soil For North Side Of Building
-
U
Siding Being Installed
-
V
-
Siding finished on new addition. Existing building sided to match new construction.
-
Siding finished on new addition. Existing building sided to match new construction.
-
Siding finished on new addition. Existing building sided to match new construction.
-
Siding finished on new addition. Existing building sided to match new construction.
-
Siding finished on new addition. Existing building sided to match new construction.
-
Custom Artwork onto Wall to Start 7ft Hand Painted Mural
-
Continue Painting Mural Onto Existing Screen Printing Production Wall
-
Mural Complete. Artist Signing.